Orange Line Shutdown and GLX Closure
Orange Line Shutdown and GLX Closure Friday, August 19 - September 18, 2022 The 30-day Orange Line shutdown (9 PM, August 19 – September 18) will overlap with Green Line diversions. Find out what this means for your travel and download the Rider’s Guide to Planning Ahead. As part of the Building a Better T program, addressing...